Şen, Halil and Bülbül, Kerem (2015) A strong preemptive relaxation for weighted tardiness and earliness/tardiness problems on unrelated parallel machines. Informs Journal on Computing, 27 (1). pp. 135-150. ISSN 1091-9856 (Print) 1526-5528 (Online)
This is the latest version of this item.
PDF (This is a RoMEO green journal -- author can archive pre-print (ie pre-refereeing))
Rm_WET.pdf
Download (527kB)
Rm_WET.pdf
Download (527kB)
Official URL: http://dx.doi.org/10.1287/ijoc.2014.0615
Abstract
Research on due date-oriented objectives in the parallel machine environment is at best scarce compared to objectives such as minimizing the makespan or the completion time-related performance measures. Moreover, almost all existing work in this area is focused on the identical parallel machine environment. In this study, we leverage on our previous work on the single machine total weighted tardiness (TWT) and total weighted earliness/tardiness (TWET) problems and develop a new preemptive relaxation for both problems on a bank of unrelated parallel machines. The key contribution of this paper is devising a computationally effective Benders decomposition algorithm to solve the preemptive relaxation formulated as a mixed-integer linear program. The optimal solution of the preemptive relaxation provides a tight lower bound. Moreover, it offers a near-optimal partition of the jobs to the machines. We then exploit recent advances in solving the nonpreemptive single-machine TWT and TWET problems for constructing nonpreemptive solutions of high quality to the original problem. We demonstrate the effectiveness of our approach with instances of up to five machines and 200 jobs.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | unrelated parallel machines; weighted tardiness; weighted earliness and tardiness; preemptive relaxation; Benders decomposition; transportation problem; lower bound; heuristic |
Subjects: | T Technology > T Technology (General) > T055.4-60.8 Industrial engineering. Management engineering T Technology > T Technology (General) > T055.4-60.8 Industrial engineering. Management engineering > T57.6-57.97 Operations research. Systems analysis |
Divisions: | Faculty of Engineering and Natural Sciences > Academic programs > Manufacturing Systems Eng. Faculty of Engineering and Natural Sciences |
Depositing User: | Kerem Bülbül |
Date Deposited: | 16 May 2015 21:07 |
Last Modified: | 02 Aug 2019 16:15 |
URI: | https://research.sabanciuniv.edu/id/eprint/26908 |
Available Versions of this Item
-
A strong preemptive relaxation for weighted tardiness and earliness/tardiness problems on unrelated parallel machines. (deposited 21 May 2013 11:56)
-
A strong preemptive relaxation for weighted tardiness and earliness/tardiness problems on unrelated parallel machines. (deposited 10 Jul 2014 16:27)
- A strong preemptive relaxation for weighted tardiness and earliness/tardiness problems on unrelated parallel machines. (deposited 16 May 2015 21:07) [Currently Displayed]
-
A strong preemptive relaxation for weighted tardiness and earliness/tardiness problems on unrelated parallel machines. (deposited 10 Jul 2014 16:27)