Beşikçi, Umut and Bilge, Ümit and Ulusoy, Gündüz (2012) Resource portfolio problem under relaxed resource dedication policy in a multi-project environment. In: 13th International Conference on Project Management and Scheduling, Leuven, Belgium
PDF
besikci_bilge_ulusoy_pms2012.pdf
Download (202kB)
besikci_bilge_ulusoy_pms2012.pdf
Download (202kB)
Item Type: | Papers in Conference Proceedings |
---|---|
Uncontrolled Keywords: | Resource portfolio problem, relaxed resource dedication policy, multi-project scheduling |
Subjects: | T Technology > T Technology (General) > T055.4-60.8 Industrial engineering. Management engineering > T57.6-57.97 Operations research. Systems analysis |
Divisions: | Faculty of Engineering and Natural Sciences > Academic programs > Industrial Engineering Faculty of Engineering and Natural Sciences |
Depositing User: | Gündüz Ulusoy |
Date Deposited: | 20 May 2015 15:40 |
Last Modified: | 26 Apr 2022 09:18 |
URI: | https://research.sabanciuniv.edu/id/eprint/26856 |