Proactive project scheduling with a bi-objective genetic algorithm in an R&D department

Warning The system is temporarily closed to updates for reporting purpose.

Capa, Canan and Ulusoy, Gündüz (2014) Proactive project scheduling with a bi-objective genetic algorithm in an R&D department. In: 14th International Conference on Project Management and Scheduling, Munich, Germany

[thumbnail of Capa_Ulusoy_PMS2014_Robust_Project_Scheduling_with_a_Bi-Objective_GA.pdf] PDF
Capa_Ulusoy_PMS2014_Robust_Project_Scheduling_with_a_Bi-Objective_GA.pdf

Download (143kB)
Item Type: Papers in Conference Proceedings
Uncontrolled Keywords: proactive project scheduling, multi-objective genetic algorithm, R&D
Subjects: T Technology > T Technology (General) > T055.4-60.8 Industrial engineering. Management engineering > T57.6-57.97 Operations research. Systems analysis
Divisions: Faculty of Engineering and Natural Sciences > Academic programs > Industrial Engineering
Faculty of Engineering and Natural Sciences
Depositing User: Gündüz Ulusoy
Date Deposited: 08 Nov 2014 21:25
Last Modified: 26 Apr 2022 09:16
URI: https://research.sabanciuniv.edu/id/eprint/25007

Actions (login required)

View Item
View Item