Capa, Canan and Ulusoy, Gündüz (2014) Proactive project scheduling with a bi-objective genetic algorithm in an R&D department. In: 14th International Conference on Project Management and Scheduling, Munich, Germany
PDF
Capa_Ulusoy_PMS2014_Robust_Project_Scheduling_with_a_Bi-Objective_GA.pdf
Download (143kB)
Capa_Ulusoy_PMS2014_Robust_Project_Scheduling_with_a_Bi-Objective_GA.pdf
Download (143kB)
Official URL: https://mediatum.ub.tum.de/doc/1200549/1200549.pdf
Item Type: | Papers in Conference Proceedings |
---|---|
Uncontrolled Keywords: | proactive project scheduling, multi-objective genetic algorithm, R&D |
Subjects: | T Technology > T Technology (General) > T055.4-60.8 Industrial engineering. Management engineering > T57.6-57.97 Operations research. Systems analysis |
Divisions: | Faculty of Engineering and Natural Sciences > Academic programs > Industrial Engineering Faculty of Engineering and Natural Sciences |
Depositing User: | Gündüz Ulusoy |
Date Deposited: | 08 Nov 2014 21:25 |
Last Modified: | 26 Apr 2022 09:16 |
URI: | https://research.sabanciuniv.edu/id/eprint/25007 |