Beşikci, Umut and Bilge, Ümit and Ulusoy, Gündüz (2013) Resource dedication problem in a multi-project environment. Flexible Services and Manufacturing Journal (Sl), 25 (1-2). pp. 206-229. ISSN 1936-6582 (Print) 1936-6590 (Online)
This is the latest version of this item.
PDF (Research Paper)
FSMJ_UBesikci_UBilge_GUlusoy.pdf
Restricted to Registered users only
Download (447kB) | Request a copy
FSMJ_UBesikci_UBilge_GUlusoy.pdf
Restricted to Registered users only
Download (447kB) | Request a copy
PDF (This is a RoMEO green journal -- author can archive post-print (ie final draft post-refereeing))
RD_version_FSMJ_Besikci_Bilge_Ulusoy.pdf
Download (699kB)
RD_version_FSMJ_Besikci_Bilge_Ulusoy.pdf
Download (699kB)
Official URL: http://dx.doi.org/10.1007/s10696-012-9140-9
Abstract
There can be different approaches to the management of resources within
the context of multi-project scheduling problems. In general, approaches to multiproject scheduling problems consider the resources as a pool shared by all projects. On the other hand, when projects are distributed geographically or sharing resources between projects is not preferred, then this resource sharing policy may not be feasible. In such cases, the resources must be dedicated to individual projects throughout the project durations. This multi-project problem environment is defined here as the resource dedication problem (RDP). RDP is defined as the optimal dedication of resource capacities to different projects within the overall limits of the resources and with the objective of minimizing a predetermined objective function. The projects involved are multi-mode resource constrained project scheduling problems with finish to start zero time lag and non-preemptive activities and limited renewable and nonrenewable resources. Here, the characterization of RDP, its mathematical formulation and two different solution methodologies are presented. The first solution approach is a genetic algorithm employing a new improvement move called combinatorial auction for RDP, which is based on preferences of projects for resources. Two different methods for calculating the projects’ preferences based on linear and Lagrangian relaxation are proposed. The second solution approach is a Lagrangian relaxation based heuristic employing subgradient optimization. Numerical studies demonstrate that the proposed approaches are powerful methods for solving this problem.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Multi-project scheduling; Resource dedication problem; Resource preference; Lagrangian relaxation; MRCPSP |
Subjects: | T Technology > T Technology (General) > T055.4-60.8 Industrial engineering. Management engineering |
Divisions: | Faculty of Engineering and Natural Sciences > Academic programs > Manufacturing Systems Eng. Faculty of Engineering and Natural Sciences |
Depositing User: | Gündüz Ulusoy |
Date Deposited: | 09 Nov 2012 12:30 |
Last Modified: | 31 Jul 2019 14:13 |
URI: | https://research.sabanciuniv.edu/id/eprint/20012 |
Available Versions of this Item
-
Resource dedication problem in a multi-project environment. (deposited 05 Dec 2011 16:27)
- Resource dedication problem in a multi-project environment. (deposited 09 Nov 2012 12:30) [Currently Displayed]