Gultekin, Hakan and Gürel, Sinan and Taşpınar, Rabia (2021) Bicriteria scheduling of a material handling robot in an m-machine cell to minimize the energy consumption of the robot and the cycle time. Robotics and Computer Integrated Manufacturing, 72 . ISSN 0736-5845 (Print) 1879-2537 (Online)
Full text not available from this repository. (Request a copy)
Official URL: https://dx.doi.org/10.1016/j.rcim.2021.102207
Abstract
This study considers a flowshop type production system consisting of m machines. A material handling robot transports the parts between the machines and loads and unloads the machines. We consider the sequencing of the robot moves and determining the speeds of these moves simultaneously. These decisions affect both the robot's energy consumption and the production speed of the system. In this study, these two objectives are considered simultaneously. We propose a second order cone programming formulation to find Pareto efficient solutions. We also develop a heuristic algorithm that finds a set of approximate Pareto efficient solutions. The conic formulation can find robot schedules for small cells with less number of machines in reasonable computation times. Our heuristic algorithm can generate a large set of approximate Pareto efficient solutions in a very short computational time. Proposed solution approaches help the decision-maker to achieve the best trade-off between the throughput of a cell and the energy efficiency of a material handling robot.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Bicriteria scheduling; Energy consumption; Robot speed control; Robotic cell; Second order cone programming |
Divisions: | Faculty of Engineering and Natural Sciences > Academic programs > Industrial Engineering Faculty of Engineering and Natural Sciences |
Depositing User: | Rabia Taşpınar |
Date Deposited: | 04 Sep 2022 12:13 |
Last Modified: | 04 Sep 2022 12:13 |
URI: | https://research.sabanciuniv.edu/id/eprint/43512 |