Koca, Esra and Yaman, Hande and Aktürk, M. Selim (2018) Stochastic lot sizing problem with nervousness considerations. Computers and Operations Research, 94 . pp. 23-37. ISSN 0305-0548 (Print) 1873-765X (Online)
This is the latest version of this item.
PDF (Manuscript submitted to COR)
COR-S-16-01374.pdf
Restricted to Repository staff only
Download (552kB) | Request a copy
COR-S-16-01374.pdf
Restricted to Repository staff only
Download (552kB) | Request a copy
Official URL: http://dx.doi.org/10.1016/j.cor.2018.01.021
Abstract
In this paper, we consider the multistage stochastic lot sizing problem with controllable processing times under nervousness considerations. We assume that the processing times can be reduced in return for extra cost (compression cost). We generalize the static and static-dynamic uncertainty strategies to eliminate setup oriented nervousness and control quantity oriented nervousness. We restrict the quantity oriented nervousness by introducing a new concept called promised production amounts, and considering new range constraints and a nervousness cost function. We formulate the problem as a second-order
cone mixed integer program (SOCMIP), and apply the conic strengthening. We observe the continuous mixing set substructure in our formulation that arises due the controllable processing times. We reformulate the problem by using an extended formulation for the continuous mixing set and solve the problem by a branch-and-cut approach. The computational experiments indicate that our solution method can solve larger instances in less computation times than the off-the-shelf solver. Moreover, in our computational experiments we investigate the impact of new restrictions, specifically the additional cost of eliminating the setup oriented nervousness, on the total costs and the system nervousness. Our computational results clearly indicate that we could significantly reduce
the nervousness costs and generate more stable production schedules with a relatively small increase in the total cost.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Stochastic lot sizing problem; Controllable processing times; Nervousness; Continuous mixing set |
Subjects: | T Technology > TS Manufactures > TS0155-194 Production management. Operations management |
Divisions: | Faculty of Engineering and Natural Sciences > Academic programs > Industrial Engineering Faculty of Engineering and Natural Sciences |
Depositing User: | Esra Koca |
Date Deposited: | 06 Sep 2018 15:16 |
Last Modified: | 22 May 2023 15:15 |
URI: | https://research.sabanciuniv.edu/id/eprint/36551 |
Available Versions of this Item
-
Stochastic lot sizing problem with nervousness considerations. (deposited 02 Nov 2016 15:57)
-
Stochastic lot sizing problem with nervousness considerations. (deposited 15 Sep 2017 14:48)
- Stochastic lot sizing problem with nervousness considerations. (deposited 06 Sep 2018 15:16) [Currently Displayed]
-
Stochastic lot sizing problem with nervousness considerations. (deposited 15 Sep 2017 14:48)