Kahvecioğlu, Gökçe and Balcıoğlu, Ahmet Barış (2016) Coping with production time variability via dynamic lead-time quotation. OR Spectrum, 38 (4). pp. 877-898. ISSN 0171-6468 (Print) 1436-6304 (Online)
This is the latest version of this item.
PDF (This is a RoMEO green journal -- author can archive pre-print (ie pre-refereeing))
submit_2_kahvecoglu_balcioglu.pdf
Download (145kB)
submit_2_kahvecoglu_balcioglu.pdf
Download (145kB)
PDF
kahvecioglu_balcioglu.pdf
Restricted to Registered users only
Download (552kB) | Request a copy
kahvecioglu_balcioglu.pdf
Restricted to Registered users only
Download (552kB) | Request a copy
Official URL: http://dx.doi.org/10.1007/s00291-015-0425-8
Abstract
In this paper, we propose two dynamic lead-time quotation policies in an M/GI/1 type make-to-stock queueing system serving lead-time sensitive customers with a single type of product. Incorporating non-exponential service times in an exact method for make-to-stock queues is usually deemed difficult. Our analysis of the proposed policies is exact and requires the numerical inversion of the Laplace transform of the sojourn time of an order to be placed. The first policy assures that the long-run probability of delivering the product within the quoted lead-time is the same for all backlogged customers. The second policy is a refinement of the first which improves the profitability if customers are oversensitive to even short delays in delivery. Numerical results show that both policies perform close to the optimal policy that was characterized only for exponential service times. The new insight gained is that the worsening impact of the production time variability, which is felt significantly in systems accepting all customers by quoting zero lead times, decreases when dynamic lead-time quotation policies are employed.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | make-to-stock queues; M_n/GI/1/K; inventory/production policies; due date quotation; service time variability |
Subjects: | Q Science > QA Mathematics > QA273-280 Probabilities. Mathematical statistics |
Divisions: | Faculty of Engineering and Natural Sciences > Academic programs > Industrial Engineering Faculty of Engineering and Natural Sciences |
Depositing User: | Barış Balcıoğlu |
Date Deposited: | 21 Sep 2016 10:40 |
Last Modified: | 26 Apr 2022 09:33 |
URI: | https://research.sabanciuniv.edu/id/eprint/29624 |
Available Versions of this Item
-
Coping with production time variability via dynamic lead-time quotation. (deposited 05 Dec 2015 22:47)
- Coping with production time variability via dynamic lead-time quotation. (deposited 21 Sep 2016 10:40) [Currently Displayed]