Items where Author is "Bürgy, Reinhard"
The system is temporarily closed to updates for reporting purpose. |
Group by: Item Type | No Grouping
Jump to: Article
Number of items: 1.
Article
Bürgy, Reinhard and Bülbül, Kerem (2018) The job shop scheduling problem with convex costs. European Journal of Operational Research, 268 (1). pp. 82-100. ISSN 0377-2217 (Print) 1872-6860 (Online)