title
  

Economic lot scheduling with resources in parallel

Warning The system is temporarily closed to updates for reporting purpose.

Haksöz, Çağrı and Pinedo, Michael (2008) Economic lot scheduling with resources in parallel. [Working Paper / Technical Report] Sabanci University ID:SU_FMAN_2008/0007

[img]
Preview
PDF - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
223Kb

Item Type:Working Paper / Technical Report
Uncontrolled Keywords:Economic Lot Scheduling, Parallel Resources, Multiple Knapsack, Bin Packing, Heuristics
Subjects:T Technology > TS Manufactures > TS0155-194 Production management. Operations management
ID Code:10903
Deposited By:Çağrı Haksöz
Deposited On:06 Dec 2008 14:38
Last Modified:17 Jul 2019 16:37

Repository Staff Only: item control page