Creator/Author/Editor: Yano, Candace2007Bülbül, Kerem and Kaminsky, Philip and Yano, Candace (2007) Preemption in single machine earliness/tardiness scheduling. Journal of scheduling, 10 (4-5). pp. 271-292. ISSN 1094-6136 (Print) 1099-1425 (Online) 2004Bülbül, Kerem and Kaminsky, Philip and Yano, Candace (2004) Flow shop scheduling with earliness, tardiness and intermediate inventory holding costs. Naval research logistics, 51 (3). pp. 407-445. ISSN 0894-069X |