Çapa, Canan and Ulusoy, Gündüz and Kılıç, Kemal (2013) A three-phase approach for R&D project scheduling. In: International IIE (Institute of Industrial Engineers) Conference (IIE 2013): The Global Reach of Industrial Engineering, Istanbul, Turkey
Canan_GU_KK_IIE2013_19042013.pdf
Download (431kB)
| Item Type: | Papers in Conference Proceedings |
|---|---|
| Divisions: | Faculty of Engineering and Natural Sciences > Academic programs > Industrial Engineering Faculty of Engineering and Natural Sciences Faculty of Engineering and Natural Sciences > Academic programs > Manufacturing Systems Eng. |
| Depositing User: | Kemal Kılıç |
| Date Deposited: | 23 Jan 2014 10:50 |
| Last Modified: | 26 Apr 2022 09:14 |
| URI: | https://research.sabanciuniv.edu/id/eprint/23863 |


