Client-contractor bargaining on net present value in the context of a project with limited resourcesKavlak, Nursel and Ulusoy, Gündüz and Birbil, Ş. İlker and Sivrikaya Şerifoğlu, Funda (2005) Client-contractor bargaining on net present value in the context of a project with limited resources. In: 35th International Conference on Computers and Industrial Engineering, İstanbul, Turkey Full text not available from this repository. AbstractThis study focuses on the client-contractor bargaining problem in the context of multi mode resource constrained project scheduling. The bargaining objective is to maximize the bargaining function comprised of the individual NPV maximizing objectives of both the client and the contractor. Tabu Search and Simulated Annealing are proposed as solution procedures.
Repository Staff Only: item control page |